Green Rock Industrial Subdivision, Nanaimo, BC
ALL PROJECTS

This project consisted of the construction of a 24-lot Industrial Subdivision. The subdivision is unique in that the stormwater management system was designed and constructed using bio-swales to control the release rate of the stormwater and provide removal of pollutants. Newcastle Engineering provided all civil design engineering services, construction layout and inspection of the installation and final project documentation.

NEXT PROJECT
HAVE QUESTIONS?
Get In Touch With Us
Contact