Newcastle Engineering was the Project Manager/Design Engineer for the onsite Civil works for Canadian Tire, Home Depot, Future Shop and six commercial retail units.
The first phase of the project involved detailed design, tendering, contract administration and construction inspection of the site fill, along with grading, which included an earthworks design package involving 60,000 cubic meters of imported material to prepare the pad for construction of Canadian Tire, Home Depot, Future Shop and six stand-alone buildings.
The second phase of the project, completed in 2012, involved the detailed design of water mains, sanitary sewer, storm sewer, grading of access roads, parking lots and stormwater detention pond and other stormwater management features.